Why cold patch replaced hot mix for repair work
For new pavement and large resurfacing, hot mix is still the standard. For repair work — potholes, edge breaks, utility cuts, trench reinstatement — cold patch has effectively replaced it because the logistics of hot mix (plant within 90 minutes, dry weather window, paving crew) don't match the operational reality of repair.
Cold patch fits the repair model: small jobs, dispersed locations, weather happens whenever it happens, and the repair needs to be done now.




